Energy-efficient Resource Utilization in Cloud Computing Giorgio L. Valentini1,2 , Samee U. Khan1 , and Pascal Bouvry2 1

North Dakota State University, NDSU-CIIT Green Computing and Communications Laboratory, Department of Electrical and Computer Engineering, Fargo, ND 58108-6050, [email protected] 2 University of Luxembourg, Computer Science and Communications Research Unit, Faculty of Science, Technology and Communication, Kirchberg L-1359, Luxembourg, {firstname.lastname}@uni.lu

Abstract In cloud computing systems, the energy consumption of the underutilized resources accounts for a substantial amount of the actual energy use. Inherently, a resource allocation strategy that considers the resource utilization would increase the energy efficiency of the system. Task consolidation is an effective technique that increase the system resource utilization. Recent studies reported that energy consumption (in servers) scales linearly with (processor) resource utilization. The aforementioned fact highlights the significant contribution of task consolidation to reduce in turn the energy consumption of the system. In our study, we analyze two existing energy-conscious heuristics for task consolidation. Both heuristics aim to maximize resource utilization, with the main difference being whether the energy consumption to execute the given task is implicitly or explicitly considered. To improve the energy efficiency of task consolidation, we propose a bi-objective algorithm that combines the two heuristics, in order to take advantage of both. According to our experimental results on cloud computing systems, the proposed algorithm increases the energy efficiency of the task consolidation problem, without any performance degradation when individually compared with the two existing energy-conscious heuristics.

1

1

Introduction

Nowadays, data communications are an important element of our daily lives. Most of our interactions rely on gathering the information through the clientserver paradigm [7]. Over time, user demands have rapidly increased in terms of the number of requests. To cater to the consistent amount of requests, the computational capacities and facilities must be constantly reviewed and improved. As a drawback, the proportional nonnegligible amount of the required energy has been often left behind to remain competitive. The recent advocacy of “green” or “sustainable computing” (tightly coupled with energy consumption) has been getting considerable attention. The scope of sustainable computing goes beyond the main computing components, expanding into a much larger range of resources associated with computing facilities as auxiliary equipment, such as the water used for cooling and the physical/floor space occupied by the resources. In cloud computing energy consumption and resource utilization are strongly coupled. Specifically, resources with a low utilization rate still consume an unacceptable amount of energy compared to the energy consumption of a fully utilized or sufficiently loaded cloud computing. According to recent studies ([23], [28], [44], [5]), average resource utilization in most data centers can be as low as 20%, and the average energy consumption of idle resources can be as high as 60% (or peak power). To increase resources utilization, task consolidation is an effective technique, greatly enabled by virtualization technologies, which facilitate the concurrent execution of several tasks and in turn reduce the energy consumption. Our study uses two energy-conscious heuristics for task consolidation presented by Lee and Zomaya in [46]: MaxUtil that aims to maximize resource utilization and ECTC (acronym for Energy-Conscious Task Consolidation — an overview of the most common acronyms used in our study is provided in Table 1) that explicitly takes into account both active and idle energy consumption. For a given task, ECTC computes the energy consumption based on an objective function derived from findings reported in the literature. As stated in the findings, the energy consumption can be significantly reduced while consolidating tasks instead of being executed stand alone. Consequently, the two heuristics reduce energy consumption without any performance degradation while assigning a given task to a selected resource. To take advantage of both of the methods, while always considered separately, we propose to combine the heuristics in a bi-objective model. Identifying the resource offering the best compromise between the objectives will most likely truly maximize the utilization rate while minimizing the energy consumption. The main idea of the proposed model being to execute the task on the optimal “energy-efficient” resource. The remainder of this chapter is organized as follows. Section 2 overviews the related work. Section 3 details the cloud computing, energy models, and task consolidation algorithms. The bi-objective approach and the related mathematical model are described in Section 4 while the simulation results and the 2

discussions are summarized in Section 5 and Section 6, respectively. Section 7 conclude our study.

2

Related Work

Energy efficiency is an emerging research issue, recently addressed by several researchers. For example, Khan and Ahmad in [38] were the first to use game theoretical methodologies to simultaneously optimize system performance and energy consumption. Since then several research works have used similar models and approaches, which have addressed a mix of research problems related to large scale computing systems, such as: energy proportionality, memory-aware computations, data intensive computations, energy-efficient, grid scheduling, and green networks ([37], [25], [10], [8], [4], [45], [19], [13], [29]). Cloud computing and green computing paradigms are closely related and are gaining more concerns. The energy efficiency of cloud computing became one of the most crucial research issues. Advancements in hardware technologies [41], such as lowpower CPUs, solid state drives, and energy-efficient computer monitors have relieved the energy issue to a certain degree. Meanwhile, a considerable amount of software approach researches were conducted such as: scheduling and resource allocation ([45], [22], [9], [32], [18], [20], [30]), task consolidation ([35], [47], [21], [33]). Virtualization technologies are a key component within task consolidation approach. Parallel processing have been greatly eased and boosted with the prevalence of many-core processors. That is, multiples tasks are often ran on a single many-core processor. The parallel processing practice seems at a glance to inherently increase performance and productivity. But the trade-off between the aforementioned increase and the consequent energy consumption should be carefully investigated. For example, the load imbalance (especially in the many-core processors) is a major source of energy drainage that has motivated multiples task consolidation studies ([35], [47], [21], [33]). Srikantaiah et al. in [35] approached the task consolidation using the traditional bin-packing problem with two main characteristics: (a) CPU usage and (b) disk usage. The proposed algorithm consolidates the tasks relying on the Pareto front to balance the energy consumption and the performance. The algorithm incorporates two main steps: (1) the determination of the optimal points from the profiling data and (2) the “energy-aware” resource allocation using the Euclidean distance between the current selection and the optimal point within each server. Song et al. in [47] proposed an utility analytic model for Internet-oriented task consolidation. The model considers task’s request for Web services such as e-books database or e-commerce. The proposed model aims to maximize the resource utilization and to reduce the energy consumption, offering the same quality of services proper to the dedicated servers. The model also measure the performance degradation of the consolidated tasks through the introduced “impact factor” metric.

3

The task consolidation mechanisms detailed by Torres et al. in [21] and Nathuji et al. in [33] deal with the energy reduction using unusual approaches, especially in [21]. Unlike typical task consolidation strategies, the approach used in [21] adopts two interesting techniques: (1) memory compression and (2) request discrimination. The first enables the conversion of the CPU power into extra memory capacity to allow more (memory intensive) tasks to be consolidated, whereas the second blocks useless/unfavorable requests (coming from Web crawlers) to eliminate unnecessary resource usage. The VirtualPower approach proposed in [33] incorporates task consolidation into the power management, combining “soft scaling” and “hard scaling” methodologies. The two methodologies (of [21] and [33]) are based on power management facilities equipped with virtual machines and physical processors, respectively. More recently, several noteworthy efforts on energy-aware scheduling (in large scale distributed computing systems as grids) using game theoretic approaches have been reported ([34], [38]). Subrata et al. in [34] propose a cooperative game model and the Nash Bargaining solution to address the grid load balancing problem. The main objective is to minimize energy consumption while maintaining a specified service quality (i.e. time and fairness). Both, [38] and [34], deal with independent jobs through (semi-)static scheduling mode leveraging DVFS technique to minimize the energy consumption. (For recent literature reviews the reader is referred to [1], [11], and [12].)

3 3.1

The Energy Efficient Utilization of Resources in Cloud Computing Systems The Cloud Computing

The underlying system consists of a set R = {r0 , . . . , rm−1 } of m resources (processors) that are fully interconnected in the sense that a route exists between any two resources. It is assumed that resources are homogeneous in terms of computing capability and capacity. The aforementioned is achieved through the virtualization technologies [14]. Nowadays, as many-core processors and virtualization tools are commonplace [14]. The number of concurrent tasks on a single physical resource is loosely bounded and a cloud computing can span across multiple geographical locations. The cloud computing model we consider, is assumed to: (a) be confined to a particular physical location, (b) have the inter-processor communications performing with the same speed on all links without substantial contentions, and (c) allow messages to be transmitted from one resource to another while a task is being executed on the recipient resource.

3.2

Energy Model

The energy model is based on the fact that processor utilization has a linear relationship with energy consumption. The proportional relationship means

4

Table 1: The most common acronyms used in this book chapter Acronym aj BTC d D dj δ ECTC ej i Ei ER F fi,j fx fy m MaxUtil m(p) n normx pi pmax pmin p∆ ri R tj T ui,j Ui UR τx τ0 τ1 τ2 λ µ

[xmin : xmax ] [ymin : ymax ]

Description Arrival time of a task Bi-objective Task Consolidation (algorithm) Distance between two points Solution set in the two-dimension search space Due date of a task Normalized complement of the distance result (d) Energy-Conscious Task Consolidation Energy consumption of a task on a resource Minute energy factor of a resource Energy consumption of a resource Energy consumption of the system Subset (of equivalents solutions) of D Generic cost function Normalized result of the ECTC cost function Result of the MaxUtil cost function Number of resources Maximum (rate) Utilization Objectives vector Number of tasks Normalization function Point in the two-dimensional search space Power consumption at peak load Power consumption in the active mode pmax − pmin ith resource Set of resources j th task Set of tasks Resource usage of a task Utilization rate of a resource Utilization rate of the system Generic time periods of the ECTC cost function Total processing time of a task on a resource Time period where a task is run alone Time period where a task is consolidated Output / Input (ratio) ECTC unit range MaxUtil unit range

5

that, for a particular task, the information on the processing time and the processor utilization is sufficient to measure the energy consumption for the task. At any given time, for a resource ri , the utilization Ui is defined as Ui =

n−1 X

ui,j ,

(1)

j=0

where n is the number of tasks running at the given time and ui,j is the resource usage of a task tj . The energy consumption Ei of a resource ri at any given time is defined as Ei = (pmax − pmin ) × Ui + pmin ,

(2)

where pmax is the power consumption at the peak load (or 100% utilization) and pmin is the minimum power consumption in the active mode (or as low as 1% utilization). Consequently, at any given time, the total utilization (UR ) as the total energy consumption (ER ) of the system are defined as UR =

m−1 X

Ui

and ER =

m−1 X

Ei ,

(3)

i=0

i=0

respectively, where m represents the number of resources. The resources in the underlying system are assumed to be incorporated with an effective power-saving mechanism for idle time slots. The mechanism results from the significant difference in energy consumption, between active and idle resources states. Specifically, the energy consumption of an idle resource at any given time is set to 10% of pmin . Because the overhead to turn off and back on a resource takes a nonnegligible amount of time, the option for idle resources was not considered in our study or by others ([35], [47], [21], [33], [46]).

3.3

The Task Consolidation Problem

The task consolidation (also known as server/workload consolidation) problem is the process of assigning a set T = {t0 , . . . , tn−1 } of n tasks (service requests or simply services) to a set R = {r0 , . . . , rm−1 } of m cloud computing resources, without violating time constraints. The main purpose remains to maximize resource utilization and ultimately to minimize energy consumption. Time constraints are directly related to the resource usage associated with the tasks. More precisely, in the consolidation problem, the resources allocated to a particular task must sufficiently provide the resource usage of that given task. For example, a task with its resource usage requirement of 60% cannot be assigned to a resource for which the available resource utilization at the time of that task’s arrival is 50%.

6

3.4 3.4.1

The Task Consolidation Algorithm Overview

Task consolidation is an effective means to manage resources, particularly in cloud computing, both in the “short-terms” and “long-term” ([24], [31]). In the short-term case, volume flux on incoming tasks can be “energy-efficiently” dealt with by reducing the number of active resources and putting redundant resources into a power-saving mode, or even turning off some idle resources systematically. In the long-term case, cloud infrastructure providers can better supply power and resources, alleviating the burden of excessive operational costs due to over provisioning. Lee and Zomaya [46] focused on the short term case, even if the results delivered by the task consolidation algorithms could be used as an estimator in the long-term provisioning case. Subsection 3.4.2 presents the energy conscious task consolidation heuristics (ECTC and MaxUtil ), more commonly referred to as cost functions [46]. The two cost functions are described side by side to highlight the main differences, being whether the energy consumption is considered explicitly or implicitly. More precisely, MaxUtil makes task consolidation decisions based on resource utilization, which is a key indicator for energy efficiency. 3.4.2

The Cost Functions (ECTC and MaxUtil)

The cost function, termed ECTC, computes the actual energy consumption of the current task by subtracting the minimum energy consumption (pmin ) required to run a task, if other tasks would be running in parallel with that task. That is, the energy consumption of the overlapping time period among the running tasks and the current task (tj ) is explicitly taken into account. The cost function tends to discriminate the task being executed in a stand alone mode. The value fi,j of a task tj on a resource ri obtained using the ECTC cost function is defined as fi,j = [(p∆ × uj + pmin ) × τ0 ] − [(p∆ × uj + pmin ) × τ1 + (p∆ × uj × τ2 )], (4) where p∆ is the difference between pmax and pmin , uj is the utilization rate of tj , and τ0 , τ1 , and τ2 are the total processing time of tj . That is, the time period tj is running stand alone and that tj is running in parallel with one or more tasks, respectively. For example, consider two tasks (t0 and t1 ) that are running in parallel on the same resource (r0 ), with t0 arriving first on the resource (see Figure 1). While computing the result for f0,1 τ0

=

the total execution time of t1 ,

τ1

= τ0 − τ2 ,

τ2

= τ0 − τ1 ,

where τ1 is the time period where t1 will be running stand alone on r0 , and τ2 the time period where t1 will be consolidated with t0 in r0 (the overlapping time). 7

Figure 1: Time periods of the task t1 The rationale behind the ECTC cost function is that the energy consumption at the lowest resource utilization is far greater than that in idle state, and the additional energy consumption imposed by overlapping tasks contributes to a relatively low increase. Alternatively, the MaxUtil cost function is derived with the average utilization during the processing time of the current task, as core component. The cost function aims to increase consolidation density and has a double benefit. That is, (a) the implicit reduction of the energy consumption is directly related to (b) the decreased number of active resources. In others words, MaxUtil tends to intensify the utilization of a small number of resources. Consequently, the value fi,j of a task tj on a resource ri using the MaxUtil cost function is defined as P τ0 Ui fi,j = τ =1 , (5) τ0 which is the utilization of a resource ri , as defined in Equation (1), divided by the total execution time (τ0 ) of task tj . 3.4.3

The Task Consolidation Algorithm

In essence, for a given task, the algorithm checks every resource and identifies the most energy-efficient resource for that task. The evaluation of the most energyefficient resource is dependent on the used heuristic (ECTC or MaxUtil ). More specifically, on the employed cost function (referred to as fi,j ). Algorithm 1 describes the main steps of the task consolidation procedure.

3.5

Application of the Model — A Working Example

As incorporated into the energy model, energy consumption is directly proportional to the resource utilization. At a skimmed glimpse, for any two taskresource matches, the one with a higher utilization may be selected. However, because the determination of the right match is not entirely dependent on the

8

input : tj ∈ T = {t0 , . . . , tn−1 }, R = {r0 , . . . , rm−1 } output: r∗ ∈ R begin r∗ ←− ∅ forall the ri ∈ R do Compute the cost function value fi,j of tj on ri if fi,j > f∗,j then r∗ ←− ri f∗,j ←− fi,j Assign tj to r∗ Algorithm 1: Task consolidation algorithm

current task, ECTC makes its decisions based rather on the (sole) energy consumption of that task. Table 2 details four tasks properties specifically selected (as the working example) to point out the divergent behavior of ECTC and MaxUtil. For each task (tj ) we specified the arrival time (aj ), processing time (τ0 ), and utilization or resource usage requirement (uj ). For the working example it is assumed that pmin is set to 20 and pmax to 30. These values can be seen as rough estimates in actual resources and can be referenced as 200 watt and 300 watt, respectively. Conforming to the respective properties presented in Table 2, each task (tj ) will be assigned to the more “energy-efficient” resource (ri ) selected through the cost functions. Figure 2 depicts the allocation of the first three tasks, where task t3 illustrates the divergence from the results obtained from the respective cost functions. Based on the (sole) energy consumption of the task, ECTC assigns t3 to the resource r1 (see Figure 2(a)), while based on the available utilization rate of the resources, MaxUtil assigns t3 to the resource r0 (see Figure 2(b)). The difference between the two functions becomes more prominent when task t4 must be assigned to a resource. As illustrated in Figure 3, ECTC can only assign t4 to the empty resource r2 (see Figure 3(a)), while MaxUtil assigns t4 to r1 (see Figure 3(b)). On our specific working example MaxUtil seems to be more “energy-efficient” than ECTC. Ref.[46] claimed that the performances of the algorithms can be slightly ameliorated incorporating task migration. At each computational time, the

Table 2: Task properties Task (tj ) 0 1 2 3 4

Arrival Time (aj ) 00 (sec.) 03 (sec.) 07 (sec.) 14 (sec.) 20 (sec.)

Processing Time (τ0 ) 20 (sec.) 08 (sec.) 23 (sec.) 10 (sec.) 15 (sec.)

9

Utilization (uj ) 40% 50% 20% 40% 70%

(a) ECTC

(b) MaxUtil

Figure 2: Depiction of the first three tasks

(a) ECTC

(b) MaxUtil

Figure 3: Final depiction for all the tasks scheduler checks if some of the running tasks would be more “energy-efficient”, when allocated to a different resource. If suitable, then the scheduler proceeds with the migration. Interestingly, the benefit of using migration is not apparent. Migrated tasks tend to be with short remaining processing times and these tasks are most likely to hinder the consolidation of new arriving tasks. Consequently, the incorporation of task migration increased the energy consumption.

4 4.1

Bi-Objective Approach The Main Idea

The algorithm described in Section 3.4 uses only one of the two cost functions at a time. In advance, it must be decided whether to use ECTC or MaxUtil. 10

According to the working example described in Section 3.5, for a given task, the result of the two cost functions can converge as diverge. The divergence comes from the two different considered aspects (energy consumption or resource utilization). The idea behind the bi-objective model is to combine the two cost functions to only benefit from their advantages. The algorithm will then provide, as a result, the more “energy-efficient” resource based on both of the considered aspects. That is, the (sole) energy consumption as the resource utilization.

4.2

The Motivation

We must note that ECTC computes the energy consumption of a given task on a selected resource, while MaxUtil looks after the more energy-efficient resource in terms of resource utilization. The ECTC cost function is designed to encourage resource sharing. As stated in Subsection 3.4.2, for a given resource, the energy consumption of two tasks running in parallel is slightly superior than the energy consumption of a task ran alone ([17], [15], [16]). To be accurate on the computation of the energy consumption, ECTC uses τ1 and τ2 ( see Subsection 3.4.2). Based on the time periods (τx ), the cost function gives priority to resources where concurrent tasks can be fully consolidated and tends to discard the resources offering only a partial consolidation. The aforementioned scenario is illustrated in Figure 2. Task t0 do not fully overlap task t3 on resource r0 , then ECTC assigns t3 on r1 because t3 can be fully consolidated with the task t2 . The working example presented in Section 3.5 pointed out the main drawback of ECTC. Intuitively, the resulting divergence from the behavior of MaxUtil can be seen as a “domino effect” that will temporarily affect the system. Being energy efficiency (see Figure 3) the main concern of the presented heuristics, the eventuality of a “domino effect” should not be neglected while considering the ECTC cost function for the task consolidation problem as defined in Section 3.3. Alternatively, MaxUtil always minimizes the total number of used resources without individually considering the energy consumption of the given task. Because the objective of our study is to minimize the energy consumption as the total number of used resources, our proposal combines the two cost functions to select the resource that will most likely maximize the utilization rate and minimize the energy consumption.

4.3

The Approach

The approach uses the two cost functions described in Equation (4) and Equation (5). The respective results are combined to build a “point” in a twodimensional search space where ECTC gives the x coordinate and MaxUtil the y coordinate. Originally, Equation (4) returns a value greater than zero only when applied on a resource allowing task consolidation. Among the collected results, the highest value identify the most “energy-efficient” resource (if τ1 6= τ0 ), while 11

the null value identifies empty (non “energy-efficient”) resources (if τ1 = τ0 ). Figure 4 illustrates the rationale behind the ECTC cost function. To properly construct the point in the search space, the two cost functions have to be slightly modified. Defining the energy consumption ej of a task (tj ) on a given resource (ri ) as ej = (p∆ × uj + pmin ),

(6)

the value fi,j of tj on ri obtained using the ECTC cost function is now defined as  (ej × τ0 ) ; if τ1 = τ0 fi,j = (7) ((ej × τ1 ) + (p∆ × uj × τ2 )) ; otherwise. The value of fi,j obtained using the MaxUtil cost function as fi,j =

dj X

Ui ,

(8)

aj

where aj is the arrival (or ready) time and dj the due date (given by aj + τ0 ) of the current task tj .

4.4

The Metric Normalization

To find the optimum point in a two-dimensional search space, the results of the two cost functions must be normalized to a homogeneous unit scale. Because the range of MaxUtil is defined in a continuous unit scale from 1 to 100, the result of ECTC will be normalized to the unit scale of MaxUtil, from now on formally referred as [ymin : ymax ]. For a given task (tj ) the utilization on a selected resource (ri ) is directly dependent on the speed (operations per seconds) of the CPU on that resource. The amount of time needed for the resource to accomplish the task is derived from the speed of that CPU. Based on the above information (speed and time) of a

Figure 4: Structure of the ECTC cost function

12

selected resource, the maximum value (xmax ) returned by the ECTC cost function can be then estimated and the ECTC unit range defined by the bounded interval going from 0 to xmax . Defining xmin as the lower bound and xmax as the upper bound of the ECTC unit range, the normalization of the (ECTC ) metric on the unit scale [ymin : ymax ] is given as normx

:

normx

=

[xmin : xmax ] −→ [ymin : ymax ],   (fi,j − xmin ) × (ymax − ymin ) . xmax − xmin

(9)

As mentioned in the Section 4.3, for a set of resources (R = {r0 , . . . , rm−1 }) the highest value (fi,j ) returned by the cost functions identify the most “energyefficient” resource (see Algorithm 1). Because we modified the original ECTC cost function (see Equation (7)), the complement of normx , denoted as fx , must be considered fx

:

[ymin : ymax ] −→ [ymin : ymax ],

fx

=

ymax − normx ,

(10)

to coherently build the normalized two-dimensional point in the evaluation space.

4.5

The Evaluation Space

Renaming the respective returned value from the cost functions as fx for (the normalized) ECTC and fy for MaxUtil, the coordinates of the point pi for a selected resource ri is defined as pi = (fx ; fy ), and among all the points, the optimum will be the higher point giving the best compromise between the results of the two cost functions (fx and fy ). The ideal optimum points must then belong to the domain space of the function f (x) = y.

(11)

Therefore, the closer the pi is to the line (given by Equation (11)), the more probable it is for that point to be the local optimum. For every pi , the respective distance to the corresponding ideal optimum point will be computed and referred to as d = |fx − fy |. (12) The smaller the value of d, the closer the pi is to the respective ideal optimum point belonging to the domain space (of Equation (11)). This also will be the best compromise offered by the given point. The value of d will finally be the main estimator of the selection of the best candidate among the equivalent optimum solutions. 13

4.6 4.6.1

Selection of The Best Candidate The Mathematical Model

There exist many methodologies to find the optimum solution among the solution set ([36], [2], [6]). The main idea would be to avoid having to compare all points within the solution space at every decision point. The first step of our approach consists of constructing the solution search space based on the results of the two cost functions. The optimum solution will be identified and updated at the same time the solution set is constructed. By the time the solution set is built the optimum solution will be identified. The search operation will rely on the Pareto dominance criteria ([40], [42], [43]). The first point of the solution space will be set as the “current” optimum solution. The “current” solution will then be compared to the next (new) created point and updated, if needed. Formally, let D be a finite set. For a fixed natural k, a mapping m

:

D −→ Rk ,

m(p)

=

(m1 (p), . . . , mk (p)),

can be defined, whose components mi : D −→ R, ∀i : 1 ≤ i ≤ k, are denoted as objectives and Rk is the evaluation (or measurement) space of the elements of D. As already mentioned, our approach maximizes the considered objectives. Accordingly, given p and q, the two elements of D, p dominates q, and it is represented as p  q, if and only if,   ∀i : 1 ≤ i ≤ k : (mi (p) ≥ mi (q)) ∧ ∃j : 1 ≤ j ≤ k : mj (p) 6= mj (q) . (13) From our analysis and discussion of Section 4.5 it follows that m(p) = (fx , fy ), where m(p) belongs to the homogeneous unit scale [ymin : ymax ]. 4.6.2

The Algorithm

For each resource, the algorithm constructs the corresponding point in the evaluation space (D) and verify if the new created solution dominates the current optimum solution. If the aforementioned case is verified, then the algorithm updates the optimum solution. Algorithm 2 details the main steps of the procedure used to identify the optimal solution from the solution set D.

4.7

Processing of Equivalent Solutions

The design of Algorithm 2 does not identify equivalent solutions. A double dominance check must be introduced and the equivalent solutions added to a subset F (F ⊆ D). Because the optimum solution may change by the time the domain space (D) is constructed, F must “reset” each time a new optimum 14

input : tj ∈ T = {t0 , . . . , tn−1 }, R = {r0 , . . . , rm−1 } output: r∗ ∈ R begin r∗ , optimum ←− ∅ forall the r ∈ R do x ←− fx y ←− fy result ←− (x, y) if result  optimum then optimum ←− result r∗ ←− r Algorithm 2: Bi-Objective procedure

point is identified. This will ensure that the subset only contains the equivalent solutions to the latest optimum point. By the time the solution space is constructed, the equivalent optimum points will be identified. The selection among the equivalent solutions belonging to F, if any, will rely on d. Because our approach maximizes the considered objectives, the complement of d, denoted as δ, will be considered according the formula [ymin : ymax ] −→ [ymin : ymax ],

δ

:

δ

= ymax − d.

(14)

The aforementioned selection process will sequentially compare each f ∈ F with the actual optimum point. The actual optimum will then be updated based on the δ parameter, or on the sum of the two coordinates ((fx , fy ) ∈ pi ), if the pair share the same value for the x (energy consumption) or y (utilization) coordinate.

4.8

The Bi-objective Task Consolidation Algorithm

The algorithm constructs, for each resource, the corresponding point in the evaluation space (D) and verifies if the: (a) new created solution dominates the current optimum solution or (b) two solutions are equivalent, otherwise. If the fist aforementioned case is verified, then the algorithm updates the optimum solution and “reset” the equivalent solutions subset (F). Otherwise the algorithm update F with the new created solution if suitable. Among the equivalent solutions of F, the algorithm identifies the optimum solution through: (c) the δ parameter or (d) the sum of the two objectives. Algorithm 3 describes the entire procedure that identifies the optimal solution from the solution set D and the related subset F.

15

input : tj ∈ T = {t0 , . . . , tn−1 }, R = {r0 , . . . , rm−1 } output: r∗ ∈ R begin r∗ , optimum, F ←− ∅ forall the r ∈ R do x ←− fx y ←− fy δ ←− (ymax − |x − y|) result ←− (x, y) if (result  optimum) then optimum ←− result r∗ ←− r, F ←− ∅ F ←− F ∪ (result, r, δ) if ((result 6 optimum) ∧ (optimum 6 result)) then F ←− F ∪ (result, r, δ) forall the (f, r, δ) ∈ F do if ((fx 6= optimumx ) ∧ (fy 6= optimumy )) then if (δ > δoptimum ) then optimum ←− f δoptimum ←− δ r∗ ←− r else if ((fx + fy ) > (optimumx + optimumy )) then optimum ←− f δoptimum ←− δ r∗ ←− r Algorithm 3: BTC Algorithm

16

4.9

An Intuitive Example

Conforming to the data provided in Table 2, the problem will be now solved using the BTC algorithm, where for the normalization procedure into the MaxUtil unit scale, ymin have been set to 1 and ymax to 100. Table 3 summarizes the numerical results of Equation (7), Equation (8), Equation (10), and Equation (14) presented in Section 4. For each task (tj ) a maximum number of three resources (ri ) are identified. ECTC and MaxUtil represent the values of the respective cost functions (see Equation (7) and Equation (8)) for a given task (tj ) on the selected resource (ri ). The coordinates of the constructed point in the two-dimensional search space are denoted by pi (see Equation (10)), and δi (see Equation (14)), which shows the normalized complement of the distance (d) from the point (pi ) and the corresponding ideal optimum point for the selected resource (ri ). If at the arrival time of a task (tj ) the selected ri had not enough available resource utilization rate for the given tj , then that resource will not be shown in the table. The double right arrow (⇒) identifies the optimum result selected by the algorithm. For example, task t0 requires: (a) 40% of available resource utilization, (b) 20 seconds to be executed by a selected resource, and (c) arrives at time t equal to zero. In line with the aforementioned task’s properties, when evaluating the resource r0 , (d) ECTC returns a (normalized) value equal to 48 and (e) MaxUtil a value equal to 40 (because ran in stand alone mode). The coordinates of the corresponding point p0 are given based on the result obtained in: (d) and (e). The x coordinate is computed substracting 48 (result obtained in (d)) from 100 (value set as ymax ), equal to 52 (fx ). The y coordinate is equal to 40 (fy ), as computed in (e). From the coordinates (fx and fy ) of p0 we compute (f) the distance (d = |fx − fy |), equal to 12. The value of δ is then computed substracting the result obtained in (f) to ymax (δ = 100 − 12) and is equal to 88. Table 3: Results of the BTC’s computations Task (tj ) t0

t1 t2 t3 t4

Resource (ri ) ⇒ r0 r1 r2 ⇒ r0 r1 r2 ⇒ r1 r2 ⇒ r0 r1 r2 ⇒ r1 r2

ETCT 48 48 48 18 20 20 51 51 12 20 24 20 41

17

MaxUtil 40 40 40 90 50 50 20 20 80 60 40 90 70

pi (fx ; fy ) (52; 40) (52; 40) (52; 40) (82; 90) (80; 50) (80; 50) (49; 20) (49; 20) (88; 80) (80; 60) (76; 40) (80; 90) (59; 70)

δi 88 88 88 92 70 70 71 71 92 80 64 90 89

The resulting two-dimensional search space for the evaluation of task t0 on the three considered resources is illustrated in Figure 5(a). For a given task (tj ), if at least two resources (ri ) share the same coordinates (e.g. task t0 in Table 3), then that point is only represented once. In the aforementioned table and figure, the point p0 identifies r0 as the optimum (most “energy-efficient”) resource evaluated through the BTC algorithm. Consequently, the algorithm assigns t0 to r0 as depicted in Figure 6. Figure 5 illustrates the two-dimensional search spaces for each task, in agreement with the informations contained in Table 3. Among the points within the evaluation space, the (black) full dot (within the subset F) identifies the optimum point (resource) for the given task, while the line given by Equation (11) represents the ideal optimum points. Throughout the numerical results summarized in the aforementioned table (visually reflected in Figure 5), the BTC algorithm evaluates and identifies the optimum solution simultaneously considering two aspects: (a) the resource utilization rate and (b) the energy consumption implied by a given task. As a result, the solution selected by the algorithm is the “energy-efficient” optimum in terms of both (a) and (b). Figure 6 depicts an additional representation of the optimum scenario provided by the algorithm after completing the evaluation of our intuitive example. The four tasks have been assigned only on two resources. As expected the algorithm maximized the resource utilization rate simultaneously minimizing the system’s energy consumption. For each given task of our particular example, BTC selected the same solutions than MaxUtil (see Figure 3(b)). The main difference being that BTC always guarantee Pareto optimality in terms of energy efficiency.

5 5.1

Simulation Results Simulation Setup

The simulations were carried out using the MPICH2 framework [27]. A highperformance and widely portable implementation of the Message Passing Interface (MPI) standard [26]. MPICH2 has two main goals. First, to provide an MPI implementation that efficiently supports different computation and communication platforms (including commodity clusters, high-speed networks, and proprietary high-end computing systems). Second, to enable cutting-edge research in MPI through an easy-to-extend modular framework for other derived implementations. Throughout the simulations, the resource usage of the generated tasks was random and uniformly distributed between 4% and 95% (or 0.04 and 0.95). The minimum utilization rate of 4% avoids generating processing times lower than 1 millisecond (τ0 < 1 ms). The architecture used to simulate the environment followed the Master-Slave scheme. One selected resource (the Master) was in charge of : (a) dynamically

18

(a) t0

(b) t1

(c) t2

(d) t3

(e) t4

Figure 5: The two-dimensional search space of the BTC algorithm

19

Figure 6: The Final result identified by the BTC algorithm generating the next task and (b) selecting the “optimum” resource (the Slave) to execute that task, according to the selected energy efficiency policy. Because cloud computing systems are always ready to perform the next incoming request, our problem becomes time and space dependent. That is, every future decision will be directly dependent on the previous decision. To properly emulate the system, the simulation was divided into three steps: (a) the “seeding”, (b) the “training” (or warm-up) period, and (c) the (window) “run”. First, the resources are filled with “concurrent” tasks (seeding operation) generated on a nonlinear “time dependent” distribution, aiming to simulate some ongoing previous requests. Secondly, the new tasks were randomly generated and assigned to the “optimum” resource (training period) based on the current work-flow of the system. Finally, the run evaluates the heuristics based on a predefined interval of tasks. More precisely, the seeding operation creates the environment, the training period stabilizes the simulation, and the run evaluates the algorithm over a window consisting of one hundred thousand (105 ) tasks dynamically generated and assigned among the system. Figure 7 illustrates the aforementioned steps. The length of the warm up (“training”) period needs to be evaluated, if the state of the model at starting time does not represent the steady state of the actual system. The point at which the model seems real for the first time could be estimated as the warm-up time. In our experiment, the warm-up period is the amount of (simulated) tasks that need to run before the data collection begins [3]. The switch from the “training” to “run” occurs dynamically based on the result given by the “output to input” ratio (λ/µ), also know as the system utilization. At each task assignment, λ and µ represent the number of outgoing and incoming tasks, respectively. The ratio (λ/µ) aids in the monitoring of the system, allowing a dynamic start to the evaluation of the selected heuristic in an environment secured from collapse. The “run” starts as soon as the simulation reaches the steady state. In our environment, we considered the steady sate

20

Figure 7: The three steps of the simulation from any value of the ratio (λ/µ) greater than 0.50. The performance and behavior of the BTC algorithm were evaluated compared to the individual results obtained with Algorithm 1 presented in Section 3. Initially setting MaxUtil and successively ECTC as the cost function. Given that the main objective of our experiment was to maximize the utilization while minimizing the energy consumption, at each task assignment two global factors were logged: (a) the total rate of resources utilization (UR ) and (b) the cumulated amount of the energy consumption (ER ) of the system (see Equation (3)). Both (a) and (b) aim to observe the global behavior in terms of energy efficiency of the selected algorithms. To compare the scalability of the different heuristics, at each task assignment, we observed the speed intended as the time (in microseconds (µs)) to select the “optimum” resource. The recorded computation relied on the MPICH2 time function (MPI Wtime). The simulation environment was developed based on four different topologies: (a) 10 and 20 resources of 4 cores and (b) 5 and 10 resources of 8 cores. The number of cores available on a resource bound the maximum number of tasks that can be concurrently executed on a selected resource. The experiment follows the specifications of the task consolidation problem as explained in Section 3.3. For each resource a central processing unit (CPU) of 2, 048 GHz was assumed and equally shared between the predefined numbers of cores. The process to randomly generate the tasks is as follow. Initially, a bounded number is generated corresponding to the number of operations (per second) needed to perform that given task. Being bounded, the aforementioned prevents the resulting generated task to overflow the computational capabilities of the available resources (i.e. uj > 100% for a given task tj ). The bounded interval that generates the number of operations (per second) is directly dependent on: (a) the predefined

21

CPU speed and (b) the number of cores. From (a) and (b) we compute the sole core speed. Successively, dividing the number of operations (per second) by the sole core speed we obtain the processing time (in milliseconds (ms)) needed for the given task to be executed on a selected resource. Finally, the utilization rate of that task is derived by dividing the processing time by the predefined CPU speed. Table 4 summarizes the parameters used to set our experiment. Table 4: Parameters of the simulation environment Type

General

4 cores

8 cores

5.2 5.2.1

Parameter CPU speed Window of tasks Resource usage [xmin : xmax ] [ymin : ymax ] pmin pmax λ µ

Value 2,048 GHz 100 000 [0.04 : 0.95] [1 : 20 000] [1 : 99] 20 30 0.50

Single core speed Number of resources Number of operations per second Single core speed Number of resources Number of operations per second

512 MHz 10, 20 [1 : 9 400] 256 MHz 5, 10 [1 : 4 700]

Results Energy Efficiency

The results presented in the following graphs aim to evaluate the energy efficiency of the three heuristics: (a) MaxUtil, (b) ECTC, and (c) the Bio-objective Task Consolidation (BTC ) algorithm. For each of the heuristic we depicted four graphs (see Figure 8, Figure 9, and Figure 10) that showed the behavior, in terms of energy efficiency and task consolidation, among the four selected topologies: (a) 10 and 20 resources of 4 cores and (b) 5 and 10 resources of 8 cores. Within the aforementioned figures, the solid (blue) line represents the total utilization rate of the system while the dashed (red) line the energy consumption. The sampling rate for the collection of the system’s status was performed at each task assignment. The y axis shows the utilization as the (normalized) energy consumption unit scale, while the task index was reported following a logarithmic scale in the x axis. Figure 8 and Figure 9 corresponds to MaxUtil and ECTC, respectively, while Figure 10 to the BTC algorithm. From our results, no significant differences can be pointed out among the three heuristics conforming to the task consolidation problem. Consequently, MaxUtil, ECTC, and the BTC algorithm can be considered “energy efficiently” equal.

22

23 (d) 8 cores - 10 resources

(b) 4 cores - 20 resources

Figure 8: Results using the MaxUtil cost function

(c) 8 cores - 5 resources

(a) 4 cores - 10 resources

24 (d) 8 cores - 10 resources

(b) 4 cores - 20 resources

Figure 9: Results using the ECTC cost function

(c) 8 cores - 5 resources

(a) 4 cores - 10 resources

25 (c) 8 cores - 5 resources

(d) 8 cores - 10 resources

(b) 4 cores - 20 resources

Figure 10: Results using the BTC algorithm

(a) 4 cores - 10 resources

5.2.2

Speed Analysis

Figure 11 depicts the behavior of the heuristics in term of speed. The time needed to select the “optimum energy-efficient” resource among the system at each task assignment. The solid (blue) line represents the BTC algorithm, while the dashed (red) and the dotted (cyan) lines represent MaxUtil and ECTC, respectively. The data are represented following a logarithmic scale on both of the axis, where the task number is provided on the x and the time (in microseconds (µs)) on the y axis. Among the considered aspects (utilization rate and energy consumption), MaxUtil only considers the available utilization rate, because developed to maximize task consolidation. ECTC considers the available utilization rate (as MaxUtil ) combined with the time periods (τx ) to predict the energy consumption of the given task on a selected resource, designed to consolidate task energy-efficiently. When compared, MaxUtil proved to be faster than ECTC. The BTC algorithm uses the solutions generated by MaxUtil and ECTC to construct the (bi-objective) evaluation space, conferring to the algorithm the more complex election of the optimum solution. Consequently, our proposed algorithm was the slowest when compared, but resulted being the heuristic that provided the best “energy-efficient” solutions.

6

Discussion of Results

Recalling Section 3, our study described two existing heuristics: (a) MaxUtil and (b) ECTC. The main difference between (a) and (b) being whether the energy consumption is implicitly or explicitly considered. MaxUtil proved to maximize task consolidation reducing in turns the number of used resources. Consequently, the decreased number of used resources directly reduces the energy consumption of the system. According to the aforementioned MaxUtil was defined as implicitly energy-efficient. Alternatively, ECTC was developed to consolidate tasks that can be fully overlapped, tending to discard the consolidation option for partial-overlapping tasks. The main concern of ECTC remain the energy consumption of the given task on the selected resource, that must be minimal. Consequently, the aforementioned property defined ECTC as explicitly energy-efficient. The rationale behind the ECTC cost function relies on the energy consumption during the time periods (τx ) and pmin , the minimum power consumption in the active mode. Designed to consolidate only full overlapping tasks, ECTC allows the minimum power consumption pmin to be ignored for that given task, independently from the number of consolidated tasks. The estimation of the energy consumption of the given task will be fully dependent on the time period given by τ2 , the time period τ1 being respectively null (see Figure 4). When the consolidated task can only be partially overlapped, for that task, ECTC considers the energy consumption as follows. The time period τ1 with the implied power consumption in the active mode (pmin ) is added to the energy

26

27 (d) 8 cores - 10 resources

(b) 4 cores - 20 resources

Figure 11: Computational speed of the heuristics

(c) 8 cores - 5 resources

(a) 4 cores - 10 resources

consumption during the time period τ2 (see Figure 1). For example, if n tasks are consolidated based on partial overlap, pmin must be considered n times on n different (time periods) τ1 . Formally, let the time period (τ1 ) corresponding to the task (tj ) on a selected resource (ri ) defined as τ1j , the total power consumption of that resource must then be increased by the minute energy factor n   X i = pmin × τ1j ,

(15)

j=0

which is what ECTC tries to avoid. Because the time periods constraints are strongly related to the minimum power consumption in the active mode, ECTC can “diverge” by taking decisions that generate the “domino effect” as mentioned in Section 4.2. From the energy efficiency point of view, MaxUtil saves energy minimizing (when possible) the number of used resources of the system, while ECTC prioritizes the consolidation of full overlapping tasks. More precisely, ECTC runs as much as possible concurrent tasks under the same pmin to save that energy consumption. The proposed bi-objective algorithm named BTC was built from the two heuristics (MaxUtil and ECTC ). The BTC algorithm identifies the resource offering the best compromise between the results of the two cost functions, consolidating tasks energy-efficiently. The closer the normalized results (see Section 4), the more the offered solutions will be energy-efficiently converging. Consequently, divergent solutions will be dismissed by the BTC algorithm discarding the possibility of generating the domino effect as mentioned above.

7

Conclusion

Task consolidation, especially in cloud computing systems, became an important approach to streamline resource usage that in turn improves energy efficiency. Two existing energy-conscious heuristics for task consolidation, offering different energy-saving possibilities, were analyzed in our study. For both heuristics we identified the corresponding drawback and proposed, as a (single) solution, the Bi-objective Task Consolidation (BTC ) algorithm. The aforementioned algorithm combines the two heuristics to construct the corresponding bi-objective search space. Within the domain space, the optimum solution set and the corresponding optimum solution are selected through the Pareto dominance criteria and the Euclidean distance, respectively. The efficiency of the proposed algorithm was proved thought the evaluation study, consisting of different simulations carried out using the MPICH2 framework. Concerned about the energy efficiency of the system and the scalability of the proposed algorithm, at each task assignment we observed three main aspects: the total energy consumption, the total resource utilization, and the time needed to select the optimum solution. To evaluate the performance of the BTC algorithm according to the aforementioned criteria, the two heuristics were individually implemented and used as key indicator for the energy efficiency and the scalability. Despite the 28

more elaborate selection of the optimum solution, our study reported that the proposed BTC algorithm was the slowest when compared, but resulted being the heuristic that provided the best “energy-efficient” solution. The result of our study should not only contribute on the reduction of electricity bills of cloud computing infrastructure providers, but also promote the combinations of existing techniques toward optimized models for energy efficient use, without performance degradation.

29

References [1] A. Beloglazov, R. Buyya, Y. C. Lee, and A. Y. Zomaya, “A Taxonomy and Survey of Energy-Efficient Data Centers and Cloud Computing Systems,”, Advances in Computers, 82, 2011, pp. 47-111. [2] A. Ghosh and S. Dehuri, “Evolutionary Algorithms for Multi-Criterion Optimization: A Survey”, International Journal of Computing & Information Sciences, 2(1), April 2004. [3] A. Mehta, “Smart Modeling - Basic Methodology and Advanced Tools”, In Proc 32nd Conference on Winter Simulation (WSC ’00), Orlando, FL, USA, 1, 2000, pp. 241-245. [4] A. Y. Zomaya, “Energy-Aware Scheduling and Resource Allocation for Large-Scale Distributed Systems”, in 11th IEEE International Conference on High Performance Computing and Communications (HPCC), Seoul, Korea, 2009. [5] C. Lefurgy, X. Wang, and M. Ware, “Server-level power control”, in Proc 4th IEEE International Conference on Autonomic Computing (ICAC ’07), Jacksonville, FL, USA, June 2007, pp. 4. [6] C. A. Coello Coello, “A Comprehensive Survey of Evolutionary Based Multiobjective Optimization Techniques”, Knowledge and Information Systems, 1(3), Citeseer, 1999, pp. 129-156. [7] D. Grigoras, “Advanced Environments, Tools, and Applications for Cluster Computing”, NATO Advanced Research Workshop, IWCC 2001, Mangalia, Romania, September 2001, Lecture Notes in Computer Science, 2326, Springer, 2002. [8] D. Kliazovich, P. Bouvry, and S. U. Khan, “DENS: Data Center Energy-Efficient Network-Aware Scheduling”, in ACM/IEEE International Conference on Green Computing and Communications (GreenCom), Hangzhou, China, December 2010, pp. 69-75. [9] D. Zhu, R. Melhem, and B. R. Childers, “Scheduling with dynamic voltage/speed adjustment using slack reclamation in multiprocessor realtime systems”, IEEE Transactions on Parallel and Distributed Systems, 14(7), pp. 686-700. [10] F. Pinel, J. Pecero, P. Bouvry, and S. U. Khan, “Memory-aware Green Scheduling on Multi-core Processors”, in 39th IEEE International Conference on Parallel Processing (ICPP), San Diego, CA, USA, September 2010, pp. 485-488.

30

[11] F. Pinel, J. E. Pecero, S. U. Khan, and P. Bouvry, “A Review on Task Performance Prediction in Multi-core Based Systems”, in 11th IEEE International Conference on Scalable Computing and Communications (ScalCom), Pafos, Cyprus, September 2011. [12] G. L. Valentini, W. Lassonde, S. U. Khan, N. Min-Allah, S. A. Madani, J. Li, L. Zhang, L. Wang, N. Ghani, J. Kolodziej, H. Li, A. Y. Zomaya, C.-Z. Xu, P. Balaji, A. Vishnu, F. Pinel, J. E. Pecero, D. Kliazovich, and P. Bouvry, “An Overview of Energy Efficiency Techniques in Cluster Computing Systems”, Cluster Computing. (Forthcoming) [13] G. Valentini, C. J. Barenco Abbas, L. J. Garcia Villalba, L. Astorga, “Dynamic multi-objective routing algorithm: a multi-objective routing algorithm for the simple hybrid routing protocol on wireless sensor networks”, IET Communications, 4(14), 2010, pp. 1732-1741. [14] I. Menken and G. Blokdijk, “Virtualization - The Complete Cornerstone Guide to Virtualization Best Practices: Concepts, Terms, and Techniques for Successfully Planning, Implementing and Managing Enterprise IT Virtualization Technology”, Emereo Publishing, October 2008. [15] J. Choi, S. Govindan, B. Urgaonkar, and A. Sivasubramaniam,“Profiling, Prediction, and Capping of Power Consumption in Consolidated Environments ”, in 16th International Symposium on Modeling, Analysis, and Simulation of Computer and Telecommunication Systems (MASCOTS 2008), Baltimore, MD, USA, September 2008, pp. 3-12. [16] J. Choi, S Govindan, J. Jeong, B Urgaonkar, and A. Sivasubramaniam, “Power Consumption Prediction and Power-Aware Packing in Consolidated Environments”, in IEEE Transactions on Computers, 59(12), 2010, pp. 1640-1654. [17] J. G. Koomey, “Estimating total power consumption by servers in the U.S. and the world”, Lawrence Berkeley National Laboratory, Stanford University, 2007. [18] J. J. Chen and T. W. Kuo , “Multiprocessor energy-efficient scheduling for real-time tasks with different power characteristics”, in Proc International Conference on Parallel Processing (ICPP ’05), 2005, pp. 13-20. [19] J. Kolodziej, S. U. Khan, and F. Xhafa, “Genetic Algorithms for Energyaware Scheduling in Computational Grids”, in 6th IEEE International Conference on P2P, Parallel, Grid, Cloud, and Internet Computing (3PGCIC), Barcelona, Spain, October 2011. [20] J. Moore, J. Chase, P. Ranganathan, and R. Sharma, “Making scheduling cool: temperature-aware workload placement in data centers”, in Proc USENIX annual technical conference, 2005.

31

[21] J. Torres, D. Carrera, K. Hogan, R. Gavalda, V. Beltran, and N. Poggi, “Reducing wasted resources to help achieve green data centers”, in Proc 4th workshop on High-Performance, Power-Aware Computing (HPPAC ’08), 2008. [22] K. H. Kim, R. Buyya, and J. Kim, “Power aware scheduling of bag-oftasks applications with deadline constraints on DVS-enabled clusters”, in Proc 7th IEEE international symposium on Cluster Computing and the Grid (CCGrid ’07), 2007, pp. 541-548. [23] L. Barroso and U. Holzle, “The case for energy-proportional computing”, IEEE Computer, 40(12), 2007, pp. 33-37. [24] M. G. Jaatun, G. Zhao, and C. Rong ,“Cloud Computing: First International Conference, CloudCom 2009”, China, December 2009, Lecture Notes in Computer Science, 5931, Springer. [25] M. Guzek, J. E. Pecero, B. Dorrosoro, P. Bouvry, and S. U. Khan, “A Cellular Genetic Algorithm for Scheduling Applications and Energyaware Communication Optimization”, in ACM/IEEE/IFIP International Conference on High Performance Computing and Simulation (HPCS), Caen, France, June 2010, pp. 241-248. [26] Message Passing Interface (MPI), http://www.mpi-forum.org/, accessed April 2011. [27] MPICH2, http://www.mcs.anl.gov/research/projects/mpich2/, release 1.3.2p1, accessed April 2011. [28] P. Bohrer, E. Elnozahy, T. Keller, M. Kistler, C. Lefurgy, and R. Rajamony, “The case for power management in web servers”, Power Aware Computing, Kluwer Academic Publishers, 2002, pp. 261-289. [29] P. Ruiz, B. Dorronsoro, G. Valentini, F. Pinel, P. Bouvry, “Optimization of the Enhanced Distance Based Broadcasting Protocol for MANETs”, Journal of Supercomputing, Springer, 55, 2011, pp. 1-28. [30] Q. Tang, S. K. Gupta, and G. Varsamopoulos, “Energy-efficient thermalaware task scheduling for homogeneous high-performance computing data centers: a cyber-physical approach”, IEEE Transactions on Parallel and Distributed Systems, 19(11), 2008, pp. 1458-1472. [31] R. Buyya, J. Broberg, and A. M. Goscinski, “Cloud Computing: Principles and Paradigms”, Wiley, 1st edition, March 2011. [32] R. Ge, X. Feng and K. W. Cameron, “Performance-constrained distributed DVS scheduling for scientific applications on power-aware clusters”, in Proc the ACM/IEEE conference on SuperComputing (SC ’05), 2005, pp. 34-44.

32

[33] R. Nathuji and K. Schwan K, “VirtualPower: coordinated power management in virtualized enterprise systems”, in Proc 21st ACMSIGOPS Symposium on Operating Systems Principles (SOSP ’07), 2007, pp. 265278. [34] R. Subrata, A. Y. Zomaya, and B. Landfeldt, “Cooperative power-aware scheduling in grid computing environments”, Journal of Parallel and Distributed Computing, 70(2), pp. 84-91. [35] S. Srikantaiah, A. Kansal, and F. Zhao, “Energy aware consolidation for cloud computing”, in Proc USENIX HotPower’08: Workshop on Power Aware Computing and Systems in Conjunction with OSDI, San Diego, CA, USA, December 2008. [36] R.T. Marler and J.S. Arora, “Survey of multi-objective optimization methods for engineering”, Published online: 23 March 2004, Springer. [37] S. U. Khan, “A Self-adaptive Weighted Sum Technique for the Joint Optimization of Performance and Power Consumption in Data Centers”, in 22nd International Conference on Parallel and Distributed Computing and Communication Systems (PDCCS), Louisville, KY, USA, September 2009, pp. 13-18. [38] S. U. Khan and I. Ahmad, “A Cooperative Game Theoretical Technique for Joint Optimization of Energy Consumption and Response Time in Computational Grids”, IEEE Transactions on Parallel and Distributed Systems, 20(3), 2009, pp. 346-360. [39] T. Kuroda, K. Suzuki, S. Mita, T. Fujita, F. Yamane, F. Sano, A. Chiba, Y. Watanabe, K. Matsuda, T. Maeda, T. Sakurai, and T. Furuyama, “Variable supplyvoltage scheme for lowpower highspeed CMOS digital design”, IEEE Journal of Solid-State Circuits, 33(3), 1998, pp. 454-462. [40] V. Pareto, “Manuale di Economia Politica”, Societa Editrice Libraria, Milano, Italy, 1906. Translated into English by A. S. Schwier, “Manual of Political Economy”, New York: Macmillan, 1971. [41] V. Venkatachalam and M Franz, “Power reduction techniques for microprocessor systems”, ACM Computing Surveys, 37(3), 2005, pp. 195-237. [42] W. Stadler, “A survey of multicriteria optimization or the vector maximum problem, part I: 1776-1960”. Journal of Optimization Theory and Applications, 29(1), 1979, pp. 1-52. [43] W. Stadler, “Applications of Multicriteria Optimization in Engineering and the Sciences (A Survey)”, in M. Zeleny (ed.) Multiple Criteria Decision Making — Past Decade and Future Trends, Greenwich, CT: JAI, 1984.

33

[44] X. Fan, X.-D. Weber, and L. A. Barroso, “Power provisioning for a warehouse-sized computer”, in Proc 34th annual International Symposium on Computer Architecture (ISCA ’07), 2007, pp 1323. [45] Y. C. Lee, and A. Y. Zomaya, “Minimizing Energy Consumption for Precedence-Constrained Applications Using Dynamic Voltage Scaling,” in 9th IEEE/ACM International Symposium on Cluster Computing and the Grid (CCGrid), Shanghai, China, 2009, pp. 92-99. [46] Y. C. Lee and A. Y. Zomaya, “Energy efficient utilization of resources in cloud computing systems”, published online: 19 March 2010, Springer. [47] Y. Song, Y. Zhang, Y. Sun, and W. Shi, “Utility analysis for internetoriented server consolidation in VM-based data centers”, in Proc IEEE international conference on cluster computing (Cluster ’09), 2009.

34