Engineering Work Order

34 downloads 22360 Views 363KB Size Report
DEPARTMENT OF FACILITIES MANAGEMENT. ENGINEERING WORK ORDER. REV. 7/2010. PRECISE PROJECT LOCATION: BUILDING. ROOM #(S).
DEPARTMENT OF FACILITIES MANAGEMENT ENGINEERING WORK ORDER TYPE DATE

REQUESTER

DEPARTMENT

PHONE EXT.

REQUESTING DEPT. SIGNATURE

FUNDING #

BUILDING

ROOM #

FUNDING EXPIRATION DATE

PRECISE PROJECT LOCATION: BUILDING

PROJECT TYPE:

MINOR

MAJOR

ROOM #(S)

BUDGET

JOB DESCRIPTION:

FOR ENGINEERING USE ONLY ENGINEERING APPROVALS ENG. MGMT ASSIGNMENT

WORK ORDER #

PROJECT #

FACLT. ADMIN CHECK

ASSIGNMENT

ADMINISTRATOR

MACHINIST

ASBESTOS

MULTI-TECH

CARPENTER

OPERATIONS

CONSTRUCTION MGR

PAINTER

DRAFTING

PLUMBER

ELECTRICIAN

REFRIGERATION

FINANCIAL ANALYST

SAFETY DEPARTMENT

INSTRUMENTATION

SHEETMETAL

LABORER

OUTSIDE VENDOR

CHECK

SUPERVISOR ASSIGNED

OTHER

INSTRUCTIONS: 1. Please provide detailed information or equipment specifications, if applicable. 2. If this is a request for signs, attach “Data for Fabrication of Signs” form (available from the Engineering Department). 3. Send completed form with appropriate signature to Engineering, Forchheimer B60. REV. 7/2010

Print