£2m. Developer. T19 Northampton. (North). Kettering Road Bus Priority ..... At C7
above. WNDC/. SNC/NCC. Total Cultural Development Infrastructure Known .....
Extension to Great Billing Waste. Water Treatment Works. NRDA. AWS. 2019.
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract
A45/M1 Northampton Growth Management Scheme* (see table below) North West Bypass Phase 1 (A428 to Grange Farm) North West Bypass Phase 2 (Grange Farm to A5199) Sandy Lane Relief Road Phase 2 related to Upton Lodge Norwood Farm developments New Bus Interchange at Northampton Town Centre New Railway Transport Interchange at Northampton Castle Station Kingsthorpe Corridor Improvements
Highway and Junction Improvements to provide access to developments in the St John’s area. Plough Junction Improvements
T10
NRDA
Ransome Road Nunn Mills Link Road
T11
NRDA
London Road Ransome Road Junction
NCC/ Developer Developer
Northampton (West) Northampton NCC Town Centre St John’s Area Northampton St NCC John’s Area Avon Nunn Mills NCC/ Developer Avon Nunn Mills NCC
£30m £3.8m £1.2m
£2.3m
Grant Funded WNDC/ Developer WNDC/
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract Ref
Growth Location
Infrastructure Requirement Improvements Bedford Road Bus Priority Improvements Wellingborough Road Bus Improvements Inter Urban Bus Service Improvement
Northampton North SUE Northampton North SUE Northampton North SUE Northampton North SUE Northampton North SUE Northampton West SUE Northampton West SUE Northampton West SUE Northampton South SUE Northampton
NCC/ Developer NCC
T17 T18 T19 T20 T21 T22 T23 T24 T25
Round Spinney Interchange Improvements Local Multi Modal Interchange and Bus Route Improvement/Provision Kettering Road Bus Priority Walking and Cycling Improvement Potential Junction Provision/ Improvements Bus Route Improvement Walking and Cycling Improvement Towcester Road Bus Priority related to Northampton South Bus Route Improvement related to
NCC
NCC NCC NCC NCC NCC NCC NCC NCC
£0.34m Not known £1.8m
Developer
£0.23m
Developer
£0.12m
Developer/ NCC Developer
£1.4m
Developer
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract Ref
Northampton South Walking and Cycling Improvement London Road Bus Priority
Required for Growth at South SUE Northampton South SUE Northampton South of Brackmills SUE
Delivery Body
Broad Phasing start 2016 start 2016 start
Cost Est.
Funding Sources
£0.5m
Developer
£2.7m
Developer/ NCC
Northampton South of Brackmills SUE Northampton South of Brackmills SUE Northampton Kings Heath SUE Northampton Kings Heath SUE Northampton Kings Heath SUE Northampton Kings Heath SUE Northampton North of Whitehills SUE Northampton North of
NCC
2016 start
£1m
Developer
NCC
2016 start
£0.5m
Developer
NCC
2016 start
£3.7m
Developer
NCC
2016 start
£3.6m
Developer
NCC
2016 start
£4.3m
Developer
NCC
2016 start
£0.9m
Developer
NCC
2012 start
£1.6m
Developer
NCC
2012 start
£2m
Developer
NCC NCC
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract Ref
Growth Location
Infrastructure Requirement
T36
Northampton (South)
Bus Route Improvement
T37
Northampton (South)
Walking and Cycling Improvement
Sub Total NRDA Transport Infrastructure Known Costs Daventry T38 Daventry A5/A45 Weedon Junction Improvements
Required for Growth at Whitehills SUE Northampton Upton Park SUE Northampton Upton Park SUE
Delivery Body
Broad Cost Phasing Est.
Funding Sources
NCC
2012 start
£1.5m
Developer
NCC
2012 start
£0.2m
Developer
£180.23m Daventry
NCC
2013
£0.95m
Daventry Development Link - A45 Daventry Daventry to Northampton Corridor Improvements Relocation or Restructure of Bus Station Daventry
NCC
2021
£27m
DDC/NCC
Improvements to Long Buckby Station Facilities Long Buckby to Daventry Bus Route
Daventry
Network Rail/NCC NCC
Not known £1.2m
Daventry
NCC/ Developer NCC
Not known Not known Not known Not known 2012
Daventry North East SUE Daventry North East SUE
NCC
2015
NCC/ Developer
2021
T39
Daventry
T40
Daventry
T41
Daventry
T42
Daventry
T43
Daventry
T44
Daventry
Improvements to Public Transport Provisions Cycling Improvements within the Town
T45
Daventry
A5/B5385 Junction Improvement
T46
Daventry
B4036 Realignment
Daventry
Daventry
Growing Places Fund NTP/ Developer
£2m
Not known Network Rail/NCC Not known
£1m
Not known
£2.35m £0.7m
NTP/ Developer Developer
£0.35m
Developer
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract Ref
Growth Location
Infrastructure Requirement
Required for Growth at
Delivery Body
Broad Cost Phasing Est.
Funding Sources
T47
Daventry
Norton Traffic Calming
NCC
2016
£1m
Developer
T48
Daventry
NCC
2016
£1m
Developer
T49
Daventry
Public Transport Provision to Town Centre and Long Buckby Walking and Cycling Provision
Daventry North East SUE Daventry North East SUE Daventry North East SUE
NCC
2016
£0.5m
Developer
Sub Total Daventry Transport Infrastructure Known Costs
Towcester T50 Towcester
T51
Towcester
Walking and Cycling Improvements in the Existing Urban Area Tove Roundabout (A5/A45 Junction) Improvements Abthorpe Roundabout Improvements
£38.05m
Towcester
Towcester South SUE T52 Towcester Towcester South SUE T53 Towcester A5 Relief Road and Junction associated Towcester with SUE South SUE T54 Towcester Improvements to Public Transport Towcester Provisions South SUE T55 Towcester Walking and Cycling Provision Towcester South SUE T56 Silverstone A43 and A5 Improvements and Junction Silverstone Circuit Improvements associated with Circuit Silverstone Circuit Expansion Sub Total Towcester Transport Infrastructure Known Costs
NCC
2012 ongoing
£2m
HA/ developer HA/ developer HA/ developer NCC
2015
£3m
NTP/NCC/ Sustrans/ Developer Developer
2015
£6m
Developer
2016 start 2016 ongoing 2016 ongoing 2016
£31m
Developer
£1m
Developer
£0.8m
Developer
£10m
Developer
NCC NCC
£53.8m
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract Ref
Growth Location
Brackley T57 Brackley
Infrastructure Requirement
Required for Growth at
Delivery Body
Broad Cost Phasing Est.
Funding Sources
Walking and Cycling Improvement in Existing Urban Area
Brackley
NCC
2010 ongoing
£5.8m
Brackley North SUE
NCC
Not known
Not known
NTP/NCC/ Sustrans/ Developer Developer
Brackley North SUE
NCC
2015
£1m
Developer
Brackley North SUE Brackley East SUE Brackley East SUE
NCC
2015
£0.5m
Developer
NCC
2015
£1m
Developer
NCC
2015
£0.13m
Developer
T58
Brackley
T59
Brackley
Halse Road Link – Road/Bus Link between Brackley North and Urban Area Bus Route Improvement
T60
Brackley
Traffic Calming at Halse Village
T61
Brackley
Bus Route Improvement
T60
Brackley
Traffic Calming at Turweston Road
Sub Total Brackley Transport Infrastructure Known Costs
£8.43m
Total Transport Infrastructure Known Costs
£280.5m
Bold = Key Primary Infrastructure Project
NRDA – Northampton Related Development Area
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract
A45 Northampton Growth Management Scheme Projects
Cost Est.
M1 Junction 15 Interchange
£2.31m
Wootton Interchange
£0.8m
Queen Eleanor Interchange
£1.49m
Brackmills Interchange
£1.32m
Barnes Meadow Interchange
£2.14m
Lumbertubs Interchange
£2.6m
Great Billing Interchange
£1.58m
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract
Contribution to improving Local Health Centres at Wootton Medical Centre and Grange Park Medical Centre
PCT/GPs
2014
£0.9m
Developer
H2
Contribution required to develop a 9 GP practice within multi-purpose building located on Kings Heath SUE. (Approx 1,000sqm building required). Contribution towards Internal Refurbishment of Existing Local Practice. Relocation of Existing Practice and Expansion to Cater Patient Increase.
South, & South of Brackmills SUEs, Avon Nunn MiIlls, Wotton Fields & Grange Park Northampton Kings Heath SUE & Northampton West SUE
PCT/GPs
2016
£3m
Developer/ PCT/GPs
Northampton North of Whitehills SUE
PCT/GPs
2014
£0.6m
Developer
Northampton North SUE
PCT/GPs
2016
£2.1m
Developer/ GPs
New Primary Care Health Centre incorporating Relocation of Existing GP Practice(s) at Town Centre Location.
Daventry Town Growth and SUE
PCT/GPs
2013
£2.8m
Developer/ GPs
Revenue Contribution towards Existing Local Practice.
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract Ref
Growth Location Brackley H7 Brackley
Infrastructure Requirement
Required for Growth at
Delivery Body
Broad Phasing
Cost Est.
Funding Sources
New Primary Care Centre – 2 relocated GP Surgeries, Pharmacy, NHS Dental Facility and 60 Bed Care Home.
Brackley Town Growth and SUEs
PCT/GPs
2012
Not known
Developer/ GPs
Total Primary Health Care Infrastructure Known Costs NRDA – Northampton Related Development Area
£9.4m
Education Primary Education Ref
Growth Location Northampton E1 Northampton Town Centre
Infrastructure Requirement
Required for Growth at
Delivery Body
Broad Cost Phasing Est.
Funding Sources
Extensions to Existing Primary Schools in Northampton Urban Area
Northampton Urban Capacity
NCC
£25m
NCC/ Developer
E2
Northampton
New two form entry Primary School at Avon Nunn Mills/Ransome Road
NCC
£6.45m
NCC/ Developer
E3
Northampton
NCC
2014
£6.45m
E4
Northampton
Pineham
NCC
2014
£6.45m
E5
Northampton NRDA
New two form entry Primary School at Upton Lodge New two form entry Primary School at Pineham New two form entry Primary School at Northampton South SUE
Avon Nunn Mills/Ransome Road Upton Lodge
From 2013/14 onward 2014
Northampton South SUE
NCC
2019
£6.45m
NCC/ Developer NCC/ Developer NCC/ Developer
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract Ref E6
Required for Growth at Northampton South of Brackmills SUE Northampton Kings Heath SUE
Delivery Body NCC
Broad Cost Phasing Est. 2021 £6.45m
Funding Sources NCC/ Developer
NCC
2016
£13m
NCC/ Developer
Northampton Upton Park SUE Northampton North of Whitehills SUE Northampton North SUE Northampton West SUE
NCC
2014
£6.45m
NCC
2014
£4.05m
NCC/ Developer NCC/ Developer
NCC
2015
£10m
NCC
2015
£6.45m
New two form entry Primary School at Monksmoor Development Two new two form entry Primary Schools at Daventry North East SUE to 2026
Monksmoor Development Daventry North East SUE
NCC
2016
£6.45m
NCC
2017
£13m
New two form entry Primary School at Towcester South SUE to 2026
Towcester South SUE
NCC
2015
£6.45m
NCC/ Developer
New two form entry Primary School at Brackely North SUE
Brackely North and East SUEs
NCC
2019
£6.45m
NCC/ Developer
New two form entry Primary School at Northampton South of Brackmills SUE Two new two form entry Primary Schools at Northampton Kings Heath SUE New two form entry Primary School at Northampton Upton Park SUE New one form entry Primary School at Northampton North of Whitehills SUE New three form entry Primary School at Northampton North SUE New two form entry Primary School at Northampton West SUE
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract Ref
Growth Infrastructure Requirement Location Total Primary Education Infrastructure Known Costs
Required for Growth at
Delivery Body
Broad Cost Funding Phasing Est. Sources £129.55m
Required for Growth at
Delivery Body
Broad Cost Phasing Est.
Funding Sources
Secondary Education Ref
Growth Location Northampton E16 Northampton NRDA
Infrastructure Requirement
NCC
2017
£30m
NCC/ Developer
E17
Northampton NRDA
NCC
2018 2026
£20m
NCC/ Developer
E18
Northampton NRDA
New Secondary School (located at Northampton Northampton Kings Heath SUE) 8 to 10 form entry Extensions to existing Secondary Northampton Schools serving Northampton (Additional 6 forms of entry required) Special Needs Unit Northampton
NCC
2016
£2m
NCC/ Developer
Daventry Town
NCC
2020
£30m
NCC/ Developer
Daventry
UoN/ Moulton College/ NCC
2013
£8m
Daventry
NCC
2016
£2m
DDC/Uni of N’ton/ WNDC/ Moulton College/ Gov’t NCC/ Developer
Daventry E19 Daventry Town E20
Daventry
New Secondary School (located at Daventry North East SUE - 8 form entry) Daventry UTC (600 places)
E21
Daventry
Special Needs Unit
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract Ref
Growth Location Towcester E22 Towcester
Infrastructure Requirement
Required for Growth at
Delivery Body
Broad Cost Phasing Est.
Funding Sources
Extended and Modified Sponne Secondary School to accommodate an additional one form entry and supporting facilities.
Towcester South SUE
NCC
2021
£7m
NCC/ Developer
E23
Towcester & Brackley
Silverstone UTC (540 places)
Towcester & Brackley
Not known
Not known
E24
Towcester & Brackley
Special Needs Unit
Towcester & Brackley
Tresham College/ Silverstone Circuit/ UoN/NCC NCC
2016
£2m
Tresham College/ Silverstone Circuit /Uni of N’ton NCC/ Developer
NCC
2021
£3.5m
Brackley E25 Brackley
Extended Magdalen College School Brackely North at Brackley. Additional one form and East SUEs entry. Total Secondary Education Infrastructure Known Costs Total Education infrastructure known costs NRDA – Northampton Related Development Area
NCC/ Developer
£104.5m £234.05m
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract
Community and Leisure Community Halls/Centres Ref
Growth Location Northampton C1 NRDA
Infrastructure Requirement
Required for Growth at
Delivery Body
Broad Phasing
Cost Est.
Funding Sources
Multi Use Community Building
NBC
2016
£1.5m
C2
NRDA
Multi Use Community Building
NBC
2020
£1.5m
C3
NRDA
Multi Use Community Building
NBC
2020
£1.5m
C4
NRDA
Multi Use Community Building
Avon Nunn Mills Ransome Road Northampton King Heath SUE Northampton West SUE Northampton North SUE
Community Space within Town Centre Multi Use Facility
Daventry
NCC/ Partners
2014
£5m*
Multi Use Community Building
Daventry SUE
DDC
2020
£1.5m
Community Space within Moat Lane Multi Use Facility Multi Use Community Building
Towcester
SNC
2014
£3m*
Towcester South SUE
SNC
2020
£1.5m
Daventry C5 Daventry
C6
Daventry
Towcester C7 Towcester C8
Towcester
Total Community Centre Infrastructure Known Costs * refers to full cost of multi use facility
NRDA – Northampton Related Development Area
£17m
WNDC/ NCC/ Business Developer /Other WNDC/ SNC/NCC Developer /Other
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract Emergency Services Ref
Growth Location Northampton ES1 NRDA
Infrastructure Requirement
Required for Growth at
Delivery Body
Broad Phasing
Cost Est.
Funding Sources
Fire and Rescue Infrastructure
NRDA
Fire Service
£1.5m
ES2
Police and Safer Community Infrastructure
NRDA
Police Force
2016 onward 2016 onward
Developer /Other Developer /Other
Fire and Rescue Infrastructure
Daventry
Fire Service
£0.4m
Police and Safer Community Infrastructure
Daventry
Police Force
2016 onward 2016 onward 2016 onward 2016 onward
£0.45m
NRDA
Daventry ES3 Daventry ES4
Daventry
South Northants ES5 South Fire and Rescue Infrastructure Northants ES6 South Police and Safer Community Northants Infrastructure Total Emergency Service Infrastructure Known Costs NRDA – Northampton Related Development Area
South Northants Fire Service South Northants Police Force
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract Cultural Development Ref
Growth Location Northampton CD1 NRDA
Infrastructure Requirement
Required for Growth at
Delivery Body
Broad Phasing
Cost Est.
Funding Sources
Upgrades to Existing Libraries and Opportunities for Relocation of Library Provision within Multi Use Buildings associated with SUEs and Large Developments
NRDA
NCC/ Partners
2013 onwards
£1.5m
Developer /NCC
CD2 NRDA
Refurbishment and Extension at Northampton Library
NRDA
NCC
2014 – 2017
£10.7m
Developer /NCC
Daventry Library Plus – Located within Multi Use Building
Daventry
NCC/ Partners
2014
At C5 above
WNDC/ NCC/ Business
NCC/ Partners
2014
At C7 above £12.2m
WNDC/ SNC/NCC
Daventry DC3 Daventry
Towcester DC4 Towcester
Towcester Library Plus Relocated to Towcester Moat Lane Development Total Cultural Development Infrastructure Known Costs NRDA – Northampton Related Development Area
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract Indoor and Outdoor Sports Ref
Growth Location Northampton S1 NRDA
Infrastructure Requirement
Required for Growth at
Delivery Body
Broad Phasing
Cost Est.
Funding Sources
Provision of New 8 Court Sports Hall Provision of New Swimming Pool Improvements to Existing Rugby Facilities in Northampton.
NRDA
Not known
2020
£2.7m
NRDA NRDA
Not known RFC/RFU
2020 2016 2026
£3.2m Not known
Developer /Other Not known RFU/Sport England Developer
Daventry S4 Daventry S5 Daventry S6 Daventry
New 4 Lane 25m Pool Sports Hall 2 Synthetic Turf Pitches
Daventry Daventry Daventry
Not known Not known DDC
2020 2020 2017
£2.5m £2.2m £1.2m
Not known Not known Developer /Other
Towcester S7 Towcester
16ha to Provide for Football Pitches
Towcester
SNC
Pursue use of Tove Flood Plain for Informal Sports Pitches, Outdoor Gym and Walking Routes 1 x Synthetic Sports Pitch
Towcester
SNC
2021 – 2026 2016 2026
Not known Not known
Developer /Other Developer /Other
Towcester
SNC
2017
£0.6m
Developer /Other
SNC
2021
£5m
SNC
2021
Not known
Developer /Other Developer /Other
S2 S3
NRDA NRDA
S8
Towcester
S9
Towcester
Brackley S10 Brackley S10
Brackley
Replace Brackley Pool with 6 Lane x Brackley 25m Pool 3ha Additional Playing Pitch Brackley (Football)
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract Ref S11
Growth Location Brackley
Infrastructure Requirement 1 x Synthetic Playing Pitch
Required for Growth at Brackley
Delivery Body SNC
Broad Phasing 2017
Total Indoor and Outdoor Sport Infrastructure Known Costs
Cost Est. £0.6m
Funding Sources Developer /Other
£18m
NRDA – Northampton Related Development Area Public Realm Ref
Growth Location Northampton PR1 NRDA PR2
NRDA
PR3
NRDA
PR4
NRDA
PR5
NRDA
PR6
NRDA
Infrastructure Requirement
Required for Growth at
Delivery Body
Broad Phasing
Cost Est.
Funding Sources
Public Realm Improvements Abingdon Street Public Realm Improvements Bridge Street Public Realm Improvements Drapery /Bus Interchange Public Realm Improvements Silver Street/Access to the Derngate Theatre Public Realm Improvements Angel Street/Access to Mercers Row
Other Public Realm Improvements through Ongoing Regeneration of the Town Centre
NRDA
NBC
2012 onward
Not known
Developer /Other
£0.4m £0.6m £0.2m
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract Ref
Growth Location Daventry PR7 Daventry
Towcester PR8 Towcester
PR9
Towcester
PR 10
Towcester
Brackley PR Brackley 11
Infrastructure Requirement
Required for Growth at
Delivery Body
Broad Phasing
Cost Est.
Funding Sources
Public Realm Improvements through Ongoing Regeneration of the Town Centre
Daventry
DDC
2012 onward
Not known
Developer /Other
SNC
2012 onward
Not known
Developer /Other
SNC
2012 onward
Not known
Developer /Other
SNC
2012 onward
Not known
Developer /Other
SNC
2012 onward
Not known
Developer /Other
SNC
2012 onward
Not known
Developer /Other
SNC
2012 onward
Not known
Developer /Other
Create “Town Centre Fund” to Towcester enable Physical Improvement and Promotion of Towcester Town Centre Physical Improvements to Northern Towcester and Southern Gateways of the Town Centre Alterations to Market Square Car Towcester Park and Public Realm Improvements
Create “Town Centre Fund” to Brackley enable Physical Improvement and Promotion of Brackley Town Centre PR Brackley Physical Improvements to Northern Brackley 12 and Southern Gateways of the Town Centre PR Brackley Public Realm Improvements to Brackley 13 Market Place, Market Street, Halls Lane and Draymans Walk Total Public Realm Infrastructure Known Costs Total Community and Leisure Known Costs NRDA – Northampton Related Development Area
£2.9m £53.95m
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract
Open Space and Green Infrastructure Ref
Growth Location Northampton OP1 NRDA
Infrastructure Requirement
Required for Growth at
Delivery Body
Broad Phasing
Cost Est.
Funding Sources
Beckets Park Improvements
NRDA
NBC
Post 2012
£0.5m
OP2 NRDA
Abington Park Improvements
NRDA
NBC
Post 2012
£2.4m
OP3 NRDA
Racecourse Park Improvements
NRDA
NBC
Post 2012
£1.8m
OP4 NRDA
River Nene Regional Park Improvements to Riverside Walkways. Harpole Country Park - 37 ha to serve Residents of Upton Lodge.
NRDA
EA
2017
£0.5m
Upton Lodge/ Norwood Farm Development Northampton Kings Heath SUE
Urban Park Linking Town Centre Sites to Wider Urban Area Borough Hill Country Park Extensions/Enhancements as Formal Country Park Canal Park Linking the Expanded Country Park and Boundary Park Extension of Canal to Town Centre and Interconnect with Green Space Network.
2013 ongoing 2016
£1m
Developer/ DDC/Other Developer/ DDC/Other
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract Ref
Required for Delivery Growth at Body Daventry North DDC East SUE and Monksmoor
Broad Phasing 2016
Cost Est. £1m
Funding Sources Developer
Allocate Land for New Allotments in Towcester. Improving all Existing Green Infrastructure in the Town – inc. New Green Corridor from Sponne School to Bickerstaffs Rd. Improvements to Islington Rd Rec Ground. New 11ha Town Park at Wood Burcote to be Provided as Part of the Development.
Towcester
SNC
2015
Not known
Towcester
SNC
2012 ongoing
Not known £0.5m
Towcester South
Developer
2015 ongoing
£1m
Developer
Allocate Land for New Allotments
Brackley
SNC
2015
Not known
Provide New Open Space by Brackley Extending St James Park to the North West OP Brackley Enhancement of Disused Railway Brackley 16 Embankment off Glebe Drive Total Open Space and Green Infrastructure Known Costs
SNC
2016 ongoing
Not known £0.5m
SNC
2014
£0.5m
Developer/ Other
OP 10
Growth Location Daventry
Towcester OP Towcester 11 OP Towcester 12
OP 13
Towcester
Brackley OP Brackley 14 OP Brackley 15
Infrastructure Requirement Daventry Country Park Expansion.
NRDA – Northampton Related Development Area
£14.7m
Developer/ Other
Developer/ Other
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract
Utilities - Energy Ref
Growth Location Northampton U1 NRDA
Infrastructure Requirement
Required for Growth at
Delivery Body
Broad Phasing
Cost Est.
Funding Sources
Replacement of Transformers with Higher Rated Units or Install Secondary Substation
NRDA
2016 2026
£30m
Provider
U2
NRDA
NRDA
2016 2026
£30m
Provider
U3
NRDA
Avon Nunn Mills
WPD
2016
£3m
U4
NRDA
Northampton Kings Heath
WPD
2017
£2m
Developer/ Provider Developer/ Provider
U5
NRDA
132kv Cable from Grendon to Nunn Mills – General Upgrade and Potential Undergrounding Move Substation and Upgrade Connections to Grid One New 33/11kv Primary Substation Plus Reinforcement in Local 11kv Grid Upgrade to Brackmills Primary Substation
Western Power Distribution (WPD) WPD
Wootton Fields, WPD Grange Park and Southern SUEs
2016
£3m
Developer/ Provider
New Primary Substation for Full 4,000 Homes Development
Daventry North East SUE
WPD
2021
£2m
Developer
New Primary Substation
Towcester South SUE Silverstone Circuit
WPD
2013
£2m
Developer
WPD
2013
£3m
Developer
Daventry U6 Daventry Towcester U7 Towcester U8
Silverstone New Cabling from Brackley Circuit Substation to Silverstone Circuit Total Energy Infrastructure Known Costs NRDA – Northampton Related Development Area
£75m
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract Waste Water Ref
Growth Location Northampton W1 Northampton Town Centre
Infrastructure Requirement
Required for Growth at
Delivery Body
Broad Phasing
Cost Est.
Funding Sources
Waste and Surface Water Infrastructure, Requirement and Cost Subject to Ongoing Discussions with Anglian Water
NRDA
Post 2016
Not known
Developer
W2
Extension to Great Billing Waste Water Treatment Works
NRDA
Developer/ Anglian Water Sevices (AWS)/EA AWS
2019
£18m
AWS
Connection to the Waste Water Network from SUEs and Other Developments.
SUEs and Other Developments
AWS
Linked to Housing Delivery
Not known
Developer
Upgrading Whilton Waste Water Treatment Works
Daventry
AWS
2012
£5m
AWS
Upgrading Towcester Waste Water Treatment Works. Upgrade to Main Sewer
Towcester South SUE Towcester South SUE
AWS
2018
£5m
AWS
AWS
2013
£4m
Developer
Upgrading Brackley Waste Water Treatment Works. New Sewer from the East of Brackley Town
Brackley SUEs
AWS
2018
£5m
AWS
Brackley SUEs
AWS
2013
£4m
Developer
Northampton General
W3
SUEs and Other Development s Daventry W4 Daventry General Towcester W5 Towcester South SUE W6 Towcester South SUE Brackley W7 Brackley W8
Brackley General
Schedule of Significant Proposed Changes Section 18.0 / Appendix 4 – West Northamptonshire Infrastructure Delivery Plan – Schedule Extract Ref
Growth Infrastructure Requirement Location Total Waste Water Infrastructure Known Costs Total Utilities Infrastructure Known Costs NRDA – Northampton Related Development Area Bold = Key Primary Infrastructure Project