Date Effective: 31/01/2011. Document Title: Master ... ISO. C e ll w e b s ite . L o c a l/p rin te d c o p ie s p e rm itte d b u. t a re u n c o n tro lle d . C h e .... '0'). Optimisation study for MEMUs. July 2002. 8. RDSO/PE/IR/EMU/0008 -2002. (Rev . '0').
ISO 9001: 2008

Document No.: PE-M-4.2.3-8

Version No.: 1.0

Date Effective: 31/01/2011

Document Title: Master List of Reports.

RESEARCH DESIGNS AND STANDARDS ORGANISATION PE-M-4.2.3-8 Master List of Reports. 1.

Amendment History: S.No. 1.

Date of Amendment First issue

ICS

Version

Reasons for Amendment

1.0

First Issue under new documentation system of ISO 9001: 2008 approved by ED/Ps & EMU at Np-3 of file no. PE/ISO/07.

ICO Prepared by

Issued by

Printed 2011/01/31 Page 1 of 3

Copy controlled only when viewed on RDSO ISO Cell website. Local/printed copies permitted but are uncontrolled. Check controlled copies before use.

Manak Nagar, Lucknow - 226011

ISO 9001: 2008

Document No.: PE-M-4.2.3-8

Version No.: 1.0

Date Effective: 31/01/2011

Document Title: Master List of Reports.

2.

Purpose:

3.

Scope of Application: Applies to all Reports of the directorate.

4.

Procedure: The list is annexed. While using the list print and use only the annexed list.

5.

Referenced Documents: Nil

6.

Referenced Documents of External Origin: Nil

7.

Associated Records: Nil

8.

Responsibility and Authority

9.

Activity Responsible Creation, ICO maintenance of this document

Approver Directorate Head (EDPS)

Supporting ICS

Requirement of deviation from this form template.

Head of Directorate

Respective officer directorate

Director Incharge of Directorate

Consulted

Informed

of

Abbreviations EDPS: Executive Director/Power Supply & EMU UO : Unit Officer US : Unit Supervisor ICO: ISO Coordinating Officer ICS: ISO Coordinating Supervisor

ICS

ICO Prepared by

Issued by

Printed 2011/01/31 Page 2 of 3

Copy controlled only when viewed on RDSO ISO Cell website. Local/printed copies permitted but are uncontrolled. Check controlled copies before use.

To maintain up-to-date record of Reports issued by the directorate.

ISO 9001: 2008

Document No.: PE-M-4.2.3-8

Version No.: 1.0

Date Effective: 31/01/2011

Document Title: Master List of Reports.

Annexure List of Reports Number of Report ELPS/IR/AC/01

2.

RDSO/PE/IR/AC/0002 -1998 (Rev. ‘0’)

3.

RDSO/PE/IR/AC/0003 -1999 (Rev. ‘0’) RDSO/PE/IR/AC/0004 -1999 (Rev. ‘0’) RDSO/PE/IR/TL/0005 -2000 (Rev. ‘0’) RDSO/PE/RM/EMU/0006 -2000 (Rev. ‘0’) RDSO/PE/IR/EMU/0007 -2002 (Rev. ‘0’) RDSO/PE/IR/EMU/0008 -2002 (Rev. ‘0’)

4. 5. 6. 7. 8.

9. 10.

11. 12. 13.

14. 15. 16. 17. 18. 19.

RDSO/PE/PR/EMU/0009 -2002 (Rev. ‘0’) RDSO/PE/RM/EMU/0010 -2003 (Rev. ‘0’) RDSO/PE/PR/EMU/0011 -2004 (Rev. ‘0’) RDSO/PE/RM/EMU/0012 -2004 (Rev. ‘0’) RDSO/PE//MRVC/0013 -2004 (Rev. ‘0’)

RDSO/PE/TP/EMU/0014 -2006 (Rev. ‘0’) RDSO/PE/RM/EMU/0015 -2007 (Rev. ‘0’) RDSO/PE/PR/EMU/0016 -2010 (Rev. ‘0’) RDSO/PE/PR/AC/0017 -2010 (Rev. ‘0’) RDSO/PE/PR/AC/0019 -2010 (Rev. ‘0’) RDSO/PE/IR/AC/0017 -2020 (Rev. ‘0’)

Description Report on self generating AC coaches with Roof Mounted AC Package Units and inverters. Report of the committee nominated by Railway Board to review the failure of RMPU and to suggest remedial measures to improve its reliability. Reliability report on AC coaches. Report on cooling arrangement for Siemens make Revision – 3 inverters. Review of electrical system and equipment on self generating type non-AC pantry car. Guide lines for layout of EMU/MEMU car sheds for homing of 30/20/10 rakes of 12/16 car formation. Optimisation study for MEMUs.

Date of issue July 1994 Sept. 1998

Mar. 1999 July 1999 Aug. 2000 Aug. 2000 July 2002

Report on assessment of actual loading on motor and trailer coaches of EMUs operating in Central and Western Railways. Project Report on modification to driving cab in AC EMU and MEMUs. Report of the committee for deciding the list of ‘Must Change Items’ in POH for AC and DC EMUS and MEMUs. Report on reduction in running time of MEMUs.

Nov. 2002

Report of the committee for standardization of design of driving cab for DC and AC/DC EMUs. Technical evaluation of ICB No. MRVC/Rolling stock/2003/1 of July-2004 for 25KV/1500VDC dual voltage microprocessor controlling based 3-phase propulsion system Report of type test program for high capacity low noise motor compressor set. Report for uniform periodicity of maintenance schedule for AC/DC EMU and MEMU coaches. Report on conversion of 1500 V DC EMU stock to 25 kV AC EMU stock. Report on trial of HOG supply system with loco no. 30277 WAP7. Trial report on power factor arrangement of 50 kVA transformer in Rajdhani/ Shatabdi train. Report on mounting arrangement of 50 kVA transformer in Rajdhani/ Shatabdi train.

June 2004

Dec. 2002 Sept 2003

Jan. 2004

July 2004

Jan 2007 April 2007. Aug 2010 Aug 2010 Sept 2010 Nov. 2010

************ ICS

ICO Prepared by

Issued by

Printed 2011/01/31 Page 3 of 3

Copy controlled only when viewed on RDSO ISO Cell website. Local/printed copies permitted but are uncontrolled. Check controlled copies before use.

S. No. 1.