The Gateway Building Location | Syracuse, NY – SUNY ESF Campus Construction | August 6, 2010 - 2012 Project Cost | $28.3 Million Size | 50,000 SF Sustainable Features Designed to achieve LEED Platinum Certification 100kW array of roof-mounted solar photovoltaic cells Vegetated green roof and observation deck Combined Heat and Power System
Architecture Natural – Contemporary - Sustainable Exposed wood and steel structure Bioclimatic Façade Wood veneer, formed metal Low-e triple glazing on 30% Space Types Include: • Conference Center • College Bookstore • CHP Display